Installation and Commissioning Plan Manual
Installation and Commissioning Plan
10 Criterion
TM
Series 60
INTRODUCTION
This Introduction provides a brief overview of the supplied equipment. It is not
intended as a substitute for formal training. MTS strongly recommends formal
classroom training at the MTS facility in hardware and software operation and
maintenance.
Note: The customer shall supply specimens to be used during the system
introduction. Typically, FSEs are trained in the operation and set-up of
MTS testing systems, but are not trained in the performance/procedure of
specific tests.
INTRODUCTION TOPICS:
B2.0 Review and Training
Item Description
Performed
On Site
B2.1 Loading test methods.
B2.2 Running tests
B2.3 Saving, naming, and exporting data.
B2.4 Printing reports.
B2.5 Backup and restoring data.
B2.6 Define function
- Make simple changes to the test flow.
- Configure inputs.
- Use the formula Builder to write simple results
formulas.