Installation and Commissioning Plan Manual
Installation and Commissioning Plan
Criterion
TM
Series 60 9
FINAL CONFIGURATION & TRAINING
B1.0 Final Functional Checks & Configuration
Item Description
Performed
On Site
B1.1 Create backup of all critical files.
B1.2 Create up to three basic methods according to user-
defined specifications. Basic methods are created from a
standard compression, tensile, or peel method template.
Refer to section A1.5 for definitions of method
modifications.
B1.3 Verify methods are working and the results are
acceptable / calculated correctly.
B1.4 Clean up/organize the system workspace. Tie-wrap loose
cables, close machine panels, etc.
B1.5 For computers purchased through MTS, complete the
warranty registration