Instruction Manual
MTS Criterion™ Series 60 Product Manual
52
Moving Frames and Integrated Operations Platform
Installation
5. When the frame is stable in the upright position, lift it to the final location.
6. Move the load unit to its final location and secure the frame to the
foundation. Refer to either
“Moving the Load Unit with a Forklift” on page
53 or “Moving the Load Unit with an Overhead Crane” on page 53.