Installation and Commissioning Plan User guide
Installation and Commissioning Plan
4
MTS Criterion
TM
Series 40
TAPPI? You will be requested to provide a copy of the standard to help us
better understand your application and improve our ability to meet your
expectations. If not testing to a specific Standard (ASTM, ISO, etc), the FSE
will need written test procedures to configure the methods properly.
• Define specifications for up to three basic test methods based on supplied
master methods. The FSE will modify and verify the operation of up to three
basic test methods. Testing software templates consist of various tensile,
compressions, flex and/or peel methods. The descriptions listed below define
a list of features that can be modified to create a unique test method for your
application (refer to section C3.4 for modifications not considered to be
standard modifications):
Adding inputs or input categories to a method (sample or specimen)
Changing properties of inputs (making required, putting in panel, or
report, and so forth.)
Changing properties of formulas (when calculated, in report, report order,
and so forth.)
Adding or removing meters on the Test screen
Configuring existing hardware or software channels
Configuring meters on the Test screen
Configuring real-time graph
Configuring review graph
Configuring the tool bar
Modifying GUI (panel size and shape) in Test and Define
Modifying existing test segments (Test Segment and Break Detection tab
only)
Disabling existing test segments
Adding a limited number (<10) of new users
Changing properties of users
Changing export and report configuration items to use a different
template
Changing options in report configuration items
Changing limit detector configuration item
• Site Preparation. Is the installation site adequately prepared for the system? Is
the machine located in its final position? Is there enough space for the system
along with the proper power, network, pneumatic, and water supplies?