Copyright information © 2011 MTS Systems Corporation. All rights reserved. Trademark information MTS is a registered trademarks and MTS Criterion is a trademark of MTS Systems Corporation within the United States. These trademarks may be protected in other countries. Proprietary information Software use and license is governed by MTS’ End User License Agreement which defines all rights retained by MTS and granted to the End User.
Installation and Commissioning Plan This Installation and Commissioning Plan is a part of MTS system service, and is included in the price of the system. The tasks outlined in sections A and B are expected to be completed in two days. The customer is responsible for completing tasks A1.1 through A1.5 before the MTS FSE or MTS Authorized Service Representative (referred to as FSE throughout this document) arrives on site.
Installation and Commissioning Plan • • 4 TAPPI? You will be requested to provide a copy of the standard to help us better understand your application and improve our ability to meet your expectations. If not testing to a specific Standard (ASTM, ISO, etc), the FSE will need written test procedures to configure the methods properly. Define specifications for up to three basic test methods based on supplied master methods. The FSE will modify and verify the operation of up to three basic test methods.
Installation and Commissioning Plan • • • • Computer modifications. Will any other computer software or hardware, such as network adapters or LIMS software, be added to the system? Please provide information about any possible computer modifications prior to the installation. If time permits in the later stages of the installation, the FSE will assist your Information Services Technician with the integration of peripherals and network capabilities.
Installation and Commissioning Plan Important • • • 6 Please expect at least eight full hours of training time. The objectives for the eight hours of training time are listed under A4.0 and B2.0 of this document. The training sessions have been divided into two four-hour sessions to minimize the impact on your daily business activities and to improve the material retention level for the trainees.
Installation and Commissioning Plan A2.0 INSTALLATION PROCEDURE The system will be installed by an FSE. Depending on the system configuration, the following activities will be performed: Item Description Performed On Site A2.1 Verify that all components purchased are present according to the purchase contract and packing list. A2.2 Attach all required cables between the controller and load unit. - Transducers - Computer A2.
Installation and Commissioning Plan A3.0 SYSTEM CONFIGURATION AND FUNCTIONAL CHECKS All required activities are to be completed prior to the start of any training activity. The system will also be checked to ensure that all components are operating as intended. Depending on the system configuration, the following activities will be performed. Item Description Performed On Site A3.1 A3.2 8 Load unit functionality checks: - Verify communication and operation via handset.
Installation and Commissioning Plan Item Description Performed On Site A3.3 Additional Purchased Options: - Calibrations: See section C1.0 if purchased. System performance demonstrations: See section C2.0 if purchased. Custom test method creation: See section C3.0 if purchased. On-site computer integration: See section C4.0 if purchased. On-site computer integration does not include peripheral or network integration.
Installation and Commissioning Plan A4.0 SYSTEM INTRODUCTIOIN This introduction provides a brief overview of the supplied equipment. It is not intended as a substitute for formal training. MTS strongly recommends formal classroom training at the MTS facility in hardware and software operation and maintenance. Item Description Performed On Site A4.1 System components: - System startup and shutdown.
Installation and Commissioning Plan FINAL CONFIGURATION and TRAINING B1.0 FINAL FUNCTIONAL CHECKS AND CONFIGURATIOIN Item Description Performed On Site B1.1 Create backup of all critical files. B1.2 Create up to three basic methods according to userdefined specifications. Basic methods are created from a standard compression, tensile, or peel method template. Refer to section A1.5 for definitions of method modifications. B1.
Installation and Commissioning Plan B2.0 REVIEW AND TRAINING This introduction provides a brief overview of the supplied equipment. It is not intended as a substitute for formal training. MTS strongly recommends formal classroom training at the MTS facility in hardware and software operation and maintenance. Note: The customer shall supply specimens to be used during the system introduction.
Installation and Commissioning Plan PURCHASED OPTIONS: (Extends normal installation plan based on the number of options purchased) C1.0 ON-SITE CALIBRATIONS (purchased option) Item Description Performed On Site C1.1 C2.0 Perform on-site system calibrations of load, displacement, speed, extensometers or other accessories or transducers.
Installation and Commissioning Plan C3.0 CUSTOM METHOD DEVELOPMENT (purchased option) Item Description Performed On Site C3.1 Develop method. C3.2 Run and verify proper test operation. C3.3 Demonstrate test method execution. C3.
Installation and Commissioning Plan C5.