Manual

Damper System Operation
30
Initial Setup
Operation
Initial Setup
The initial setup tasks include the following:
Determine what types of fixtures/grips will be needed to secure the
specimen into the load frame.
Determine the position of the load frame crosshead.
Prepare the fixtures/grips, specimen, and data acquisition transducers.
Ensure that the load cell is properly rated for the test and that it is aligned
with the actuator.
Ensure the appropriate servovalve configuration is set up properly.
Ensure that the servovalve and feedback control cables are properly
connected.
Detailed information on these tasks can be found in the load frame product
manual.