Instruction manual
Generic XFCOT Software Support Page 1583 of 3156
Features and Services
Feature packaging
This feature is packaged under the following packages:
• Meridian 1 XPE (XPE) package 203
• International Supplementary Features (SUPP) package 131
• M1 Enhanced Conference, TDS and MFS (XCT0) package 204
• M1 Superloop Administration (XCT1) package 205 (unrestricted when
the XPE package is equipped)
Feature implementation
Task summary list
The following is a summary of the tasks in this section:
1 LD 97 – Choose the North American Transmission Plan by answering
YES to the NATP prompt
2 LD 14 – This prompt is used to define a disconnect supervised loopstart
trunk on an XFCOT. The Periodic Pulse Metering parameters on a per
country basis are defined in this overlay in response to the PPID prompt.
LD 97 – Choose the North American Transmission Plan by answering YES to the NATP prompt
Prompt Response Description
REQ aaa Request (CHG, END, PRT)
TYPE LOSP TYPE = LOSP (Loss Plan Tables)
NATP YES North American Transmission Plan for Generic XFCOT