Installation Sheet
7
OPTIONAL EQUIPMENT INSTALLATION GUIDELINES
THE OPTIONS BELOW ARE NOT STANDARD ON EVERY BATH. PLEASE CHECK YOUR 
ORDER FOR ANY ADDITIONAL OPTIONS ADDED.
INLINE HEATER OPTIONS:
HTI - The heater has a separate power cord that must be plugged into a 110 VAC,15 AMP, GFCI protected 
outlet. There is an indicator light on the heater to check for operation. There is no on/off control for the 
heater; it turns on each time the pump is activated.
HTISOAK - If your tub came equipped with the separate recirculating pump/heater combination, there  
 will be a separate on/off control on the tub to activate the inline heater. Both the pump and heater must be  
plugged into a 110 VAC, 20 amp, GFCI protected outlet. 
RADIANCE
®
 - Each Radiance
®
 system comes with an on/off touch pad, or designated icon on the key-
pad, and transformer box equipped with a 27" power cord. There are two heated zones for each Radiance 
system purchased. To install, simply plug the transformer box into a 110 V, GFCI protected outlet. The 
transformer box draws 5 amps.
STREAM BATH - Requires a 110V, 15 Amp GFCI circuit. Simply plug the control box into a GFCI outlet.
The pump draws 3 Amps. 
TILE FLANGE - FACTORY-INSTALLED
1. Determine mounting height of tub.
2. Make sure tub is properly bedded and level from front to back
and side to side.
3. Screw through the flange into studs. No pre-drilling is necessary.
The tile flange is not designed to support the weight of the tub!
4.
Seal  / fill the void between the tile flange and tub with clear silicone.
TILE FLANGE KIT – FIELD INSTALLATION
1. Clean tub flange.
2. Apply supplied adhesive to tub flange and tile flange with brush, being careful not to get adhesive on top of tub.
3. Position tub 2-3" from wall.
4. Apply tile flange to tub flange.
5.
Position the tub against the walls. Adhesive will set in five minutes.
6.
Seal  / fill the void between the tile flange and tub with clear silicone.
7. Trim any excess flange.
INTEGRAL TILE FLANGE
Determine mounting height of front ange of tub. If installing 
with optional skirt, mounting height is the height of the skirt. 
With front ange at proper height, shim tub until level. Care-
fully drill 1/8" holes through the tile ange at each stud loca-
tion. Use bedding compound to support tub to correct height. 
Secure to stud with screws, being careful not to over-tighten 
as this may cause acrylic to crack or chip. Do not attempt to 
drive nails through the integral ange. See images at right.
PRE-LEVELED FRAME
Place tub into proper location and attach to oor or studs with 2" screws drilled through frame. This system 
does not require bedding compound unless suboor is uneven and unit must be shimmed to achieve level. The 
pre-leveled frame adds approximately 1/2"-3" to the height of the bath.
S
T
U
D
W
A
L
L
Tub Flange
Tile and Backer Board
Sealant
2x4 Mounted on Edge
All Tub Mounts Must Be Level
Tile Flange










