Technical data

67EN 10/2010 i-KI MTD / i-KIR MTD
INSTALLER OPERATIONS CHECKLIST
U I A
CONCERNING UNIT INSTALLATION OPERATIONS AND SETUP FOR COMMISSIONING
HAVE THE FOLLOWING CHECKS BEEN COMPLETED?
Components installed (as described in the paragraph on "Water circuit connections") YES NO
Two pressure gauges with a suitable scale are installed on the inlet and outlet
❑❑
Shut-off valves are installed on the heating system circuit and domestic hot water circuit inlet and outlet ❑❑
Two thermometers are installed, on the inlet and outlet ❑❑
All pipes are insulated with suitable vapour barrier material to prevent formation of condensate and heat loss, ❑❑
with control and shut-off devices protruding from the insulation
Drain valves are installed at the lowest points in the system
❑❑
Automatic or manual air vent valves are installed at the highest points in the system ❑❑
An additional expansion vessel is installed on the system if the standard vessel is insufficient ❑❑
Vibration damper joints are installed on the inlet and outlet water pipes ❑❑
A low-loss header is installed if the water content is insufficient ❑❑
Vibration damper supports are installed on the unit ❑❑
The domestic hot water production system is installed ❑❑
The safety valve is installed and suitably sized ❑❑
The domestic hot water expansion vessel is installed and suitably sized ❑❑
Checks (as described in the paragraph on "Checking and starting up the unit")
Two pressure gauges with a suitable scale are installed on the inlet and outlet
The unit is positioned as described in the chapter on "Positioning" in this manual
The filter is installed on the system return/inlet as close as possible to the unit and in a position that is easy to
access for maintenance. REQUIRED component, this must be installed before water circulates through the heat
exchanger otherwise the warranty will be void
The filter is installed on the domestic hot water return/inlet as close as possible to the unit and in a position that
is easy to access for maintenance. REQUIRED component, this must be installed before water circulates
through the heat exchanger otherwise the warranty will be void
(Water-to-water units only) The filter is installed on the source return/inlet as close as possible to the unit and in
a position that is easy to access for maintenance. REQUIRED component, this must be installed before water
circulates through the heat exchanger otherwise the warranty will be void
The flow switch is installed on the unit's outlet to the heating system circuit and is electrically connected.
REQUIRED component, this must be installed before water circulates through the heat exchanger otherwise
the warranty will be void
(Water-to-water units only) The flow switch is installed unit's outlet to the source circuit and is electrically
connected. REQUIRED component, this must be installed before water circulates through the heat exchanger
otherwise the warranty will be void
CHECKED