Technical data
11EN 10/2010 i-KI MTD / i-KIR MTD
HEAT PUMP INSTALLATION
I A
POSITIONING
• See the figure on the side for the points used to fasten the
module (A) to the vertical wall and corresponding dis-
tances.
• Fix the unit, making sure there is easy access.
CHOICE OF INSTALLATION SITE
Before installing the unit, agree with the customer the site
where it will be installed, taking the following points into con-
sideration:
• the unit must be installed indoors;
• the unit must be installed by fastening to a vertical wall
• safety distances between the unit and other equipment
• careful attention must be paid to structures so as to
ensure sufficient ventilation.
• Follow the instructions shown in the chapter on DIMEN-
SIONED DRAWINGS to allow room for maintenance oper-
ations.
• The maximum length of the connection cable between i-
KI/i-KIR and the i-EM2/i-EMR inside module is 30 m, mak-
ing this also the maximum distance between the two mod-
ules.
If installing multiple units the clearances must be doubled.
"PE"
"L"
"N"
"6"
"60"
A
A










