8. Commissioning of the UPS-System
To ensure proper fault-free commissioning, these steps have to be followed:
Connect the external battery module with the UPS.
Connect the UPS with the enclosed connection cable to the mains power
supply.
Adjust the necessary settings on the UPS, like e.g. activation of outputs.
Connect the appliances with the UPS-outputs and switch to normal operat-
ing mode.