Technical data
12.) Check to make sure there is no excessive gap
between the pipe and the fitting. Use a .015” feeler
gauge to check interface gap
13.) Attach processor leads to the fitting and pro-
ceed with fusion as described for standard joining.
(If using a Bar-Code Processor see “Scanning Instruc-
tions” page 8)
15.) Keep the pipe and the fitting restrained until after the
fitting has completed the entire fusion cycle and the
recommended cooling time. Note the time required before
clamp removal and mark it on the fitting if necessary.
14.) Disconnect and remove the processor leads when the fusion cycle has
been completed.
16.) Reverse the installation process to remove T-Clamp.
Page 21










