Manual
8
118
117: Install the Mounng Rail into the beam clamps slot as per Mounng Rail instrucons. Use
3/8” x 1” stainless steel bolts and 3/8” serrated ange nuts. Tighten beam clamps once the rails
are in posion for modules.
118: Center rails over Angle pieces, keeping equal length of rail o the end of each angle.
117
119 A
119: Install Solar Modules as
per Mounng Rail and module
manufacturer instrucons using
top clamps. See last page of
manual for Iron Ridge Rail and
119 B
119: Install Solar Modules as per Mounng Rail and module manufacturer instrucons using top
clamps. See last page of manual for Iron Ridge Rail and Clamp instrucons.