Manual

5
107
108
107: Aach the Screw Adjuster to the tab on the Back Plate with the 1/2” x 1 1/2” Bolt, two 1/2” at
washers and 1/2” Nylock Nut.
108: Slide the 2” pipe through the screw adjuster and slide the 2.5" pipe through the U Bracket Assembly
sleeve.
109
110
109: Center pipes in sleeves. There should be approximately 17.5” of the 2.5” pipe on either side of the
sleeve.
110: Slide collars on 2.5” pipe and ghten with 1/2” x 1” square head set bolts. Hold collar rm against the
sleeve when ghtening.
17.5”
17.5”