Manual

4
103
104 A
Installaon Guide
102
101
101: With the 6" Sch 40 or Sch 80 steel pipe installed in the ground, place the liing insert
into the top of the pipe unl it sits ush.
102: Place the liing bracket into the liing insert with the eye facing south.
103: Hang a 1 ton or greater chain fall hoist from the liing eye.
104: Hang the U-Bracket Assembly on the Chain Hoist.
105
106
105: While holding the U-Bracket around the pole, insert 3 of the 3/4" x 9” bolts through the holes in the
back of the U-bracket and through the holes on the Back Plate with 3/4” at washers on both sides and
3/4” nuts.
106: Insert the 3/4” x 3” Set Bolts in Back Plate, but do not ghten if leaving chain fall hoist connected.
Note: If installing mulple mounts with a single hoist, bolt the pole cap on the pole at the desired working
height. Tighten 3/4” bolts and 3/4” set screws to 200 -lb. Assemble rack, rails and modules. Then, move
liing assembly and hoist to pole when ready to li. Aach to pole cap and loosen bolts. Connue with
raising the array for wiring or compleng the installaon.
104 B