Manual
10
Using an angle nder, adjust array to proper lt.
124
122
123
122: Insert the last 3/4" x 9” bolt over the top of the pole with the 3/4” at washers and 3/4” nut.
Securely ghten the tension bolts in the back mounng plate to 200 -lb and all 3 bolts through the U
Bracket Assembly and the back mounng plate.
123: Remove the chain hoist and liing bracket and place the 2” square cap in place.
124: Aach adjuster handle
using the 1/2” x 1” set screw.
You may cut the handle to
length depending on pole
height and site condions.