121: Insert the 5/8" x 7” bolt over
the top of the pole with the 5/8”
at washers and 5/8” nut.
Securely ghten the 4 tension
bolts in the back of the pole cap to
200 -lb.
122: Remove the chain hoist and
liing bracket and place the 1 3/8”
diameter round cap in place.
122
121
Using an angle nder, adjust
array to proper lt.
Installaon is complete.
119
119: If you are installing modules at ground level, leave a 5” gap to allow for the 4” pipe to protrude
through the array. If you are installing at the top of the pole, you do not need to provide this gap.
120: Once module installaon is complete, raise and or lt the array to facilitate module wiring and
wire management as needed. When wiring is completed, raise the array to the top of the pole.
118: Install Solar Modules as per Mounng Rail and module manufacturer instrucons using top clamps.