Manual
6
115 B
115 A
115 C
115: Plan the layout of your rails according to your module width. Install the Beam Clamps on the I-beam
using the 3/8” x 1 1/4” carriage bolts and 3/8” ange nuts.
Remember to leave a 5” gap in the center to allow for the 4” diameter pipe to protrude through, if you
wish to put all the modules on at ground level.
117
116: Install the Mounng Rail into the beam clamps slot as per Mounng Rail instrucons. Use
3/8” x 1” stainless steel bolts and 3/8” serrated ange nuts. Tighten beam clamps once the rails
are in posion for modules.
117: Center rails over Angle pieces, keeping equal length of rail o the end of each angle.
116