Manual
3
103
104 A
Installaon Guide
102 B
102 A
104 B
The 4” Angle Series Top of Pole Mount does not come standard with the liing bracket and chain hoist.
If you choose to add this opon, follow steps 101 to 104 to install the liing assembly.
101: With the 4" Sch 40 or Sch 80 steel pipe installed in the ground, slide the pole cap
over the pipe.
102: Place the liing insert into the top of the pipe unl it sits ush. Place the liing
bracket into the liing insert with the eye facing south.
103: Hang a 1 ton or greater chain fall hoist from the liing eye.
104: Hang the U-Bracket Assembly on the Chain Hoist.
101
105: If you do not have a
chain fall hoist, install pole
cap at the top of the pole, in-
sert the 5/8” x 7” bolt, two
5/8” at washers and 5/8”nut
and four 1/2” x 1” set screws.
Tighten all. Proceed with in-
stallaon of all components at
the top of the pole.
106: Aach the Tilt Adjuster
Handle to the tab on the Back
Plate with the 1/2” x 1 1/2”
Bolt, two 1/2” at washers
and 1/2” Nylock Nut.
105
106