Manual
Table Of Contents
7
116 A
116 B
Standard Beam Clamps OR Long Beam Clamps for 204” Rails
116: Standing on the North Side of the array with the Tube to Beam bolts started but not ghtened,
sight the beams to ensure they are parallel. If not, twist the array unl they are. Then ghten all the
3/4” bolts between the Pipe and Rectangular Tubes and the Tubes and the I-Beams to 100 lbs.
117 A
117: Plan the layout of your rails according to your module manufacturer’s recommendaon. Install the
Beam Clamps on the I-beam using the 3/8” x 1 1/4” carriage bolts and 3/8” ange nuts. Tighten to 20
lbs. Mounts with 204 inch rails require a 4 . long angle-shaped clamp to give extra support to the span
and canlever. Aach angle using the square plates provided and the 3/8” x 1 1/4” carriage bolts and 3/8”
ange nuts.
*For standard single pole array conguraons, see last page.
117 B










