Manual

4
103
104 A
Installaon Guide
101
105
106
105: While holding the U-Bracket around the pole, insert 2 of the 3/4" bolts (see table above for length)
through the holes in the back of the U-bracket and through the holes on the Back Plate with 3/4” at
washers and 3/4” ange nuts, but do not ghten.
106: Insert three 3/4” x 3” Set Bolts in Back Plate, but do not ghten if leaving chain fall hoist connected.
Note: If installing mulple mounts with a single hoist, bolt the pole cap on the pole at the desired working
height. Tighten 3/4” bolts and 3/4” set screws. Assemble rack, rails and modules. Then, move liing as-
sembly and hoist to pole when ready to li. Aach to pole cap and loosen bolts. Connue with raising the
array for wiring or compleng the installaon.
104 B
Safety Chain
Tie-O.
Connect the pole
cap to the liing
bracket with a
3/8” chain.
Shorten chain as
array is hoisted.
102
Oponal
101: With the vercal steel support pipe installed in the ground, place the liing insert into the top of the
pipe unl it sits ush with the top.
102: Place the liing bracket into the liing insert with the eye facing south.
103: Hang a 1 ton or greater chain fall hoist from the liing eye.
104: Hang the U-Bracket Assembly on the Chain Hoist. Aach safety chain (provided locally) if desired.
Nominal
Pole Size
3/4” Bolt
Length
6 Inch 9 Inch
8 Inch 11 Inch
10 Inch 13 Inch
Use hardware labeled STEP 1 in the Bolt Kit