Manual

3
Thank you for choosing MT Solar Pole Mounts.
It is the installers responsibility to determine the
foundaon parameters based on local site condions,
such as wind speed, snow load, soil type, exposure
category, etc. Installaons also must comply with local
building regulaons and perming requirements.
We recommend consulng a licensed engineer to
determine appropriate foundaon dimensions and pipe
size and thickness. MT Solar can also provide a stamped
drawing engineered for site-specic requirements for an
addional fee. Please contact us to nd out more.
Tips for Convenonal Pipe Installaon:
Dig hole according to recommended depth & diameter.
Set pipe in hole and use a level to ensure it is plumb and
vercal to the ground.
If installing mulple poles, use a string to line up pipes.
Build rebar cage according to specicaon.
Brace pipe to prevent movement while pouring concrete.
Pouring so that concrete is in direct contact with the soil
is recommended. If forming or using sonotube, properly
compact backll.
Allow concrete to cure for recommended length of me.
Un-packaging your mount...
Remove steel plates on
both ends of pallet to
begin unpacking parts.
You will not need the
plates or hardware for the
assembly of the mount.