Owner's Manual

Hardware Setup
MS-96E3
2-11
Hardware Setup
MS-96E3
Programming Sequence
1. program GPO6,34,33, PAIR(3:1) to switch LAN1-2 or LAN3-4 pair
2. program GPO39,38,35 CFG(3:1) to control LAN pair behavior Bypass/
PassThrough/WDT
3. set GPO24, CPLD_SendBIT high about 150ms then set it low about 50ms
to complete the LAN pair conî‚¿guration progress
4. go to next programming sequence loop for the next LAN pair!