User Guide

Advance Macro/ Hotkey Setting
The meaning of "Duration" and "Delay"
functions will be explained here.
1. “Execution” is the number of executions, must be greater or
equal than 1 to take effect.
2. If you want to hold some key, Duration = 0, Execution = 1.
3. For example, if you want to hold down the left shift and press
the English letter a, set it as shown in Figure.
4. The result is : when you press the key, you will get an
uppercase letter “A”.
5. The usage of "Delay" can be used to set the interval time
between pressing the first key and the next key.
6. For example, in the setting as shown in Figure , press “a”
after 0.5 seconds (500ms = 0.5s) and then press “b”.
7. In the above example, it should be noted that "step" must be
a different value and "Duration" must be at least 1.
8. Note: "Duration" value can not be too large, strongly
recommend less than 50.
1
Ex.1
1
Ex.2 2
2