30
Geocool® - All rights reserved Contact Information: Geocool 48 Remington Way Hickory, Ky 42051 www.geo.cool DO NOT install, operate, or maintain this equipment before carefully reading the instruction manual. Additional copies of the manual are available from the installing dealer or from Geocool. Save the manual and any other operating instructions for yourself and any future owners of this equipment. A trained Geocool installer must perform all installation practices.
GeoCool LIMITED WARRANTY STATEMENT GeoCool distributor (hereinafter “Company”) warrants this product against failure due to defect in materials or workmanship under normal use and maintenance as follows. All warranty periods begin on the date of purchase. If the date cannot be verified, the warranty period begins one hundred twenty (120) days from date of manufacture.
Two-Speed Geothermal Heat Pump Series Installation and Operation Manual February 2020 Rev.
Page 2
Table of Contents Contact Information 4 Model Nomenclature 5 Technical Data 6 Transportation and Storage 8 Electrical Hazards 9 System Installation 10 Ductwork Considerations 11 Ground Loop System 12 Open Loop System 14 Condensate Considerations 17 DHW PLumbing 18 High and Low Voltage Wiring 19 Dallas Microprocessor 21 DEC Star Blower 25 Start Up Procedures 26 Preventive Maintenance 27 Troubleshooting 29 Wiring Diagram 31 Operating Parameters 32 Page 3
Geocool - All rights reserved Geocool® has compiled this manual with care; however Geocool does not warrant that the information in this manual is free of errors. Geocool reserves the right to change any portion of this manual without notice. The appearance of any technical data or editorial material in this manual does not constitute endorsement, warranty, or guarantee by Geocool of any product, service, process, procedure, design, or the like.
MODEL NOMENCLATURE Page 5
1.
1.0 Technical Data (cont.
2.0 Transportation & Storage Move and store units in an upright position. Do not stack units. Inspect shipment for shipping damage and check packing slips for accuracy. Any equipment or cartons in question should be removed from the packing and physically inspected. If any damage is detected, the carrier should make a note on the delivery slip acknowledging the damage. In some cases smaller items like thermostat or temperature sensors will be packed and shipped inside the unit.
3.0 Electrical Hazard Warnings THE FOLLOWING IS A GENERAL WARNING STATEMENT WHICH SHOULD BE READ AND UNDERSTOOD BEFORE INSTALLING AND OR OPERATING YOUR NEW GEOCOOL™ UNIT ELECTRIC SHOCK CAN KILL!! *Always protect yourself and others. *Always turn off system power before removing panels. Some units may have more than one or two power supplies. *Keep all covers and panels in place at all times. When removed for install or service purposes never leave the cover off when left unattended.
4.0 Geocool System Installation Locate the unit in an indoor area that allows for easy servicing (see image below). Make sure that the air filter access and unit access panels are easily accessible. Provide sufficient room to make all ground loop, well water, DHW, condensate, and electrical connections. If the unit is placed in a closet, make provision for adequate service access and proper return air flow to the unit.
5.0 Ductwork Considerations Important Note: If ductwork is installed in an attic area, the ductwork needs to be built “low profile” and laid directly on the ceiling joist (code permitting). After being installed and wrapped in insulation, it is recommended the ductwork be covered with six to eight inches of cellulose.
5.2 Air Filtering To maintain good indoor air quality in a tight building, the air distribution system should have a high-efficiency air filter. To ensure proper unit operation, be sure to inform the building owner of the importance of proper maintenance and the maintenance schedule for checking/changing the filter installed. Most air filters require monthly attention. 5.
6.2 Purging the Closed Loop Purging of the closed loop and unit should only be completed after it has passed the air pressure check and all leaks have been repaired. Purging requires a high velocity pump and should only be completed by the installing dealer or sub-contractor. See drawing below for piping example.
7.0 Open Loop Systems 7.1 Water Quality Geocool units use a cupro nickel heat exchanger which has an increased resistance to ground water chemicals, which are known to cause build up and corrosion. The water source must be tested and treated before the installation of the Geocool unit. Failure to do so will void the warranty of the unit. Always maintain water pressure in the heat exchanger by placing the water control valve at the outlet of the unit to prevent deposit buildup.
IMPORTANT: On installations where the groundwater temperature is expected to fall below 50°F during any part of the heating season, perform a calculation to anticipate higher flow rate requirements. A higher water flow rate results in a lower temperature drop through the liquid to refrigerant heat exchanger. This prevents the Freeze protection/low limit from activating unnecessarily. 7.
On closed loop systems WITH ADEQUATE ANTIFREEZE, the tab labeled “ANTIFREEZE” should be broken off, lowering the unit freeze setpoint to 20 degrees. Use a small pair of needle nose pliers to break the tab (see image below). On open loop systems, the tab MUST remain in place, giving the unit a 38 degree freeze setpoint.
All Geocool vertical units have P-traps built internally within the units (see image below). These units require a vent to be installed downstream and outside of the unit. Installation of a second PTrap is not necessary and if installed, will not allow the unit's condensate pan to drain properly, All Geocool Horizontal units are low profile. Due to this, they require standard P-Traps which are vented on the leaving water side and located directly outside the unit (see image below).
9.0 DHW Tank Preparation The DHW s a vented double-wall exchanger and suitable for potable 1. Turn offcoil the ipower supply or the fuelcopper supplyheat to the DHW tank. I FisTHE POWER IS NOTwater. TURNED The DHW pump is installed inside the unit and connected to a fused terminal. OFF PRIOR TO DRAINING THE TANK, THE ELECTRIC HEATING ELEMENTS WILL BURN OUT!! 2. Close the cold water supply valve to the DHW tank. 3.
9.2. Filling the Hot Water Tank Close boiler drain valves and the isolation valves to the Geocool system. Open the cold water supply feeding the DHW tank. Open a hot water tap in the building and allow air to bleed out of the tank. Alternatively, you can depress lever on the tank relief valve to remove air trapped in the tank. Once the building plumbing is purged it is important to purge the air that is remaining in the Geocool system and plumbing between the hot water tank and the Geocool system.
10.1 Main system Power Size all wire in accordance to local electrical code. Main power will land on top of the contactor, labeled “L1 and L2”. A green ground lug will also be provided for the ground wire. 10.2 Pump outputs A terminal strip will be provided for each pump or water valve output that applies. Each will be labeled as needed. 10.2.1 Motorized water valve (Open loop) A 24 Vac terminal strip labeled “WATER VALVE” will be provided inside the control panel.
11.0 Dallas™ Microprocessor The Dallas™ microprocessor combines simplicity with advanced controls to give the end user a range of options that can meet most install situations. With the LED indicator board, unit status can be easily checked by a technician and homeowner alike. 11.1 System Safeties The Dallas board has multiple built-in safety inputs that allows multiple levels of protection on the Geocool unit. 11.1.
11.1.2 Limit Switches The Dallas board has independent inputs for low limit and high limit switches. The auto-reset high limit switch is designed to trip at 550 psi and will shut the compressor down for 5 minutes after the switch resets. A RED light will blink on the LED board labeled “HIGH PRESSURE LIMIT” while the limit is tripped and will turn solid RED when the switch has reset. If the switch trips 3 times in any 30 minute period, the board will lock the compressor out.
11.1.4 Condensate overflow switch The unit is equipped with a normally closed (N/C) float switch, factory installed in the unit’s internal drain pan. If the condensate line clogs, the float switch will be activated, shutting the compressor down and a RED light labeled “CONDENSATE FAULT” will be illuminated on the LED board. As soon as the pan drains, the light will go off and the compressor will be allowed to come back on. 11.
11.5 LED indicator On the front post of the Geocool unit, there is an LED indicator which relays unit information to the homeowner or technician. The board has a BLUE light for unit power, a GREEN light to indicate the compressor is running, and 4 different RED lights to show fault status of High Pressure Limit Switch, Low Pressure Limit Switch, Freeze Protection, and Condensate Fault.
12.0 Dec-Star ECM Blower Variable Speed Blower: Geocool redefines comfort and efficiency by incorporating the new Dec-Star EMM Blower Motor Technology in our equipment. The variable speed blower coupled with the Dallas microprocessor provide: even temperatures throughout the space, better indoor air quality, precise humidity control, quieter operation and lower utility bills. 12.
13.0 Recommended Geocool Start-Up Procedure 13.1 Startup Checklist Verify the following items are addressed before starting the unit: • If closed loop system, loop and unit are purged of air and all valves are open. • Ensure a minimum of 20% methanol or 25% Propylene glycol is purged into the loop and properly mixed. • Ensure all piping is verified to provide designed flow rate and all valves are open. • If open loop system, well has pressure (25 PSI – 50 PSI) and all valves are open.
14.0 Preventative Maintenance YOUR GEOCOOL WATER SOURCE HEAT PUMP HAS BEEN BUILT TO BE AS MAINTENANCE FREE AS POSSIBLE. THERE ARE ONLY A FEW THINGS YOU NEED TO DO TO KEEP YOUR SYSTEM RUNNING AS EFFICIENTLY AS POSSIBLE. IT’S STRONGLY RECOMMENDED TO HAVE THE UNIT CHECKED ONCE A YEAR BY A TRAINED SERVICE PROFESSIONAL. MANY INSTALLING DEALERS OFFER PREVENTATIVE MAINTENANCE CHECKS. WARNING! BEFORE PERFORMING SERVICE OR MAINTENANCE ON SYSTEM, TURN OFF ALL BREAKERS.
• DHW plumbing consists of a closed recirculating loop which is purged free of air by the installing dealer. If any maintenance or hot water tank replacement is done, ensure the DHW plumbing is properly purged of air. Consult with your installing dealer before draining the hot water tank for proper procedures. • During your annual preventative maintenance check, inspect the drain pans for debris to avoid condensate tubing blockage.
15.0 Basic Troubleshooting for the Geocool unit If an issue with your units occurs, refer to the following list for possible symptoms and corrective actions. Water around base of unit: 1. Water leak. Find and repair leak. 2. Condensation pan not draining. Check for restriction, clean pan and blow out pipe. 3. Air coil freezing. Check for dirty air filter, dirty air coil, or restriction in ductwork. Noisy operation 1. Defective fan motor/blower housing. Repair or replace blower. 2. Defective compressor.
Reversing valve won’t switch 1. Thermostat not calling for cooling. Check thermostat wiring and programming. Repair/replace if necessary. 2. No voltage to solenoid. Correct voltage issue. 3. Bad solenoid coil. Replace coil. Refrigerant pressure operating too high or locking out on high limit 1. Unit running in cooling: 1.1. Too little water flow. Check loop pump including fuse on closed loop units or check well pressure and water temperatures for open loop units. 1.2. Bad high limit switch.
16.0 Wiring diagram 3 REV.
17.0 - Operating Parameters Operating Parameters - Two Stage Models First Stage Operation EWT (F) Water Flow GPM/Ton 30 Cooling -- No Hot Water Generation Suction Pressure psig Discharge Pressure psig Superheat Subcooling Water Temp Rise (F) Air Temp Rise (F DB) 1.5 3.0 105 - 120 100 - 115 140 - 155 115 - 130 20 - 35 20 - 35 9 - 17 9 - 17 17 - 21 8 - 12 17 - 23 17 - 23 50 1.5 3.
Série de thermopompes géothermiques à deux vitesses Manuel d'installation et d'utilisation Février 2020 Rév.
Page 2
Table des matières Coordonnées 4 Nomenclature du modèle 5 Données techniques 6 Transport et entreposage 8 Risques électriques 9 Installation du système 10 Considérations relatives aux conduits 11 Système de boucle souterraine 12 Système à boucle ouverte 14 Considérations relatives aux condensats 17 Plomberie de l'eau chaude sanitaire (ECS) 18 Câblage haute et basse tension 19 Microprocesseur Dallas 21 Souffleur DEC Star 25 Procédures de démarrage 26 Maintenance préventif 27 D
Geocool - Tous droits réservés Geocool® a élaboré ce manuel avec soin ; cependant Geocool ne garantit pas que les informations contenues dans ce manuel sont exemptes d'erreurs. Geocool se réserve le droit de modifier toute partie de ce manuel sans préavis. La présence de toute donnée technique ou de tout contenu rédactionnel dans ce manuel ne constitue en aucun cas une approbation, une garantie ou une caution par Geocool de tout produit, service, processus, procédure, conception ou autre.
NOMENCLATURE DU MODÈLE Page 5
1.
1.
2.0 Transport et entreposage Déplacer et entreposer les unités en position verticale. Ne pas empiler les unités. Inspecter le colis pour vous assurer qu'il n'est pas endommagé et vérifiez l'exactitude des bordereaux d'expédition. Tout équipement ou boîte en question doit être retiré de l'emballage et inspecté physiquement. Si un dommage est constaté, le transporteur doit le signaler sur le bordereau de livraison en accusant réception du dommage.
3.0 Avertissements de danger électrique CE QUI SUIT EST UNE MISE EN GARDE GÉNÉRALE QUI DOIT ÊTRE LUE ET COMPRISE AVANT D'INSTALLER ET/OU D'UTILISER VOTRE NOUVELLE UNITÉ GEOCOOL™ UN CHOC ÉLECTRIQUE PEUT TUER !! *Toujours se protéger et protéger les autres. *Toujours éteindre le système avant de retirer les panneaux. Certaines unités peuvent avoir plus d'une ou deux alimentations. *Garder tous les couvercles et panneaux en place en tout temps.
4.0 Installation du système Geocool Placer l'unité dans un endroit couvert qui permet un entretien facile (voir l'image ci-dessous). S'assurer que l'accès au filtre à air et les panneaux d'accès de l'unité sont facilement accessibles. Prévoir suffisamment d'espace pour effectuer toutes les connexions de boucle souterraine, d'eau de puits, d'ECS, de condensat et d'électricité. Si l'unité est placée dans un placard, prévoir un accès adéquat pour l'entretien et un débit d'air de retour approprié à l'unité.
5.0 Considérations relatives aux conduits Remarque importante : Si les conduits sont installés au niveau du grenier, ils doivent être construits « à profil bas » et posés directement sur la solive de plafond (si le code le permet). Après avoir été installé et enveloppé dans du matériel isolant, il est recommandé de recouvrir le conduit de six à huit pouces de cellulose.
5.2 Filtration de l'air Pour maintenir une bonne qualité de l'air intérieur dans un bâtiment étanche, le système de distribution d'air doit être muni d'un filtre à air à haut rendement. Pour assurer le bon fonctionnement de l'unité, assurez-vous d'informer le propriétaire du bâtiment de l'importance d'une maintenance adéquate et du calendrier de maintenance pour vérifier/changer le filtre installé. La plupart des filtres à air nécessitent un entretien mensuel. 5.
6.2 Purge de la boucle fermée La purge de la boucle fermée et de l'unité ne doit être effectuée qu'après avoir passé avec succès le contrôle de la pression d'air et que toutes les fuites aient été réparées. La purge nécessite une pompe à haute vitesse et ne doit être effectuée que par le revendeur ou le soustraitant chargé de l'installation. Voir le dessin ci-dessous pour un exemple de tuyauterie.
7.0 Systèmes à boucle ouverte 7.1 La qualité de l'eau Les unités Geocool utilisent un échangeur de chaleur en cupro-nickel qui a une résistance accrue aux produits chimiques contenus dans les eaux souterraines qui peuvent causer des accumulations et la corrosion. La source d'eau doit être testée et traitée avant l'installation de l'unité Geocool. TOUT MANQUEMENT A CETTE OBLIGATION ENTRAINERA L’ANNULATION DE LA GARANTIE DE L'UNITE.
7.2 Conduite d'évacuation d'eau Les eaux d'évacuation de l'unité ne sont pas contaminées de quelque manière que ce soit et peuvent être éliminées de différentes manières. Les eaux d'évacuation devraient s'écouler à l'extérieur sans restriction vers un puits d'évacuation, un ruisseau, un étang, un bassin, un collecteur pluvial, etc. La tuyauterie de refoulement doit être préparée de manière à ce qu'elle ne gèle pas.
IMPORTANT !!! Une fois la languette retirée, l'appareil sera réglé en permanence sur 20 degrés et ne pourra plus être modifié !! Le retrait de l'onglet sur les systèmes à boucle ouverte ou les systèmes à boucle fermée sans protection minimale contre le gel annulera toute garantie sur l'unité ! Page 16
8.0 Considérations relatives au condensat Prévoir un raccord d'évacuation des condensats. Certaines installations peuvent nécessiter l'utilisation d'une pompe à condensat afin de l'évacuer vers un drain approprié. L'installation de tés supplémentaires près de l'unité Geocool est une pratique courante afin de permettre l'accès pour verser le nettoyant de drain dans le drain de condensat. S'assurer que toutes les ouvertures supplémentaires sont scellées ou bouchées.
Un interrupteur à flotteur est installé en usine à l'intérieur du bac de drainage Geocool® qui, lorsque déclenché par le refoulement du condensat, arrête le compresseur et un voyant d'état Rouge « CONDENSATE FAULT » s'affiche sur le panneau avant. Le compresseur reste éteint et le voyant allumé jusqu'à ce que le bouchage du condensat ait été éliminé. 9.0 Préparation du réservoir ECS Le serpentin d'ECS est un échangeur de chaleur raccordé à double paroi en cuivre et convient à l'eau potable.
9.2. Remplissage du réservoir d'eau chaude Fermer les vannes de drainage de la chaudière et les vannes d'isolation du système Geocool. Ouvrir l'arrivée d'eau froide alimentant le réservoir d'ECS. Ouvrir un robinet d'eau chaude dans le bâtiment et laisser l'air s'échapper du réservoir. Vous pouvez également appuyer sur le levier de la soupape de sûreté du réservoir pour retirer l'air emprisonné dans le réservoir.
10.1 Alimentation du système principal Dimensionner tous les fils conformément à la réglementation électrique locale. L'alimentation principale se posera sur le contacteur, marqué « L1 et L2 ». Une cosse de mise à la terre verte sera également fournie pour le fil de terre. 10.2 Débits de pompe Une barrette de raccordement sera fournie pour chaque sortie de pompe ou de vanne d'eau qui s'applique. Chacune sera étiquetée au besoin. 10.2.
11.0 Microprocesseur Dallas™ Le microprocesseur Dallas™ allie simplicité et commandes avancées pour offrir à l'utilisateur final une gamme d'options pouvant répondre à la plupart des situations d'installation. Grâce au panneau indicateur LED, l'état de l'unité peut être facilement vérifié par un technicien autant que par le propriétaire. 11.
11.1.2 Les interrupteurs de fin de course Le circuit imprimé Dallas dispose d'entrées indépendantes pour les interrupteurs de seuil bas et de seuil haut. L'interrupteur de fin de course haute à réenclenchement automatique est conçu pour se déclencher à 550 psi et arrêtera le compresseur pendant 5 minutes après la réinitialisation de l'interrupteur.
11.1.4 Commutateur de débordement de condensat L'unité est équipée d'un interrupteur à flotteur normalement fermé (N/C), installé en usine dans le bac de drainage interne de l'unité. Si la conduite de condensat est obstruée, l'interrupteur à flotteur est activé, ce qui arrête le compresseur et un voyant ROUGE « CONDENSATE FAULT » (PROBLÈME DE CONDENSAT) s'allume sur le panneau à DEL. Dès que le bac est vidé, la lumière s'éteint et le compresseur pourra se rallumer. 11.
11.5 Voyant DEL Le panneau avant de l'unité Geocool contient des voyants DEL qui transmettent les informations de l'unité au propriétaire ou au technicien. Le panneau a un voyant BLEU pour l'alimentation de l'unité, un voyant VERT pour indiquer que le compresseur est en marche, et 4 voyants ROUGES différents pour indiquer l'état de défaut de l'interrupteur haute pression, de l'interrupteur basse pression, de la protection antigel et du défaut du condensat.
12.0 Souffleur Dec-Star ECM Souffleur à vitesse variable : Geocool redéfinit le confort et l'efficacité en incorporant la nouvelle technologie de moteur de souffleur EMM de Dec-Star dans nos équipements. Le souffleur à vitesse variable couplé au microprocesseur Dallas assure : des températures uniformes dans tout l'espace, une meilleure qualité de l'air intérieur, un contrôle précis de l'humidité, un fonctionnement plus silencieux et des factures d'électricité réduites.
13.0 Procédure de démarrage recommandée pour Geocool 13.1 Liste de vérification au démarrage Vérifier que les éléments suivants sont pris en compte avant de démarrer l'unité : • Si le système est à boucle fermée, la boucle et l'unité doivent être purgés de l'air et toutes les vannes doivent être ouvertes. • S'assurer qu'au moins 20% de méthanol ou 25% de propylène glycol sont purgés dans la boucle et mélangés correctement.
14.0 Maintenance préventive VOTRE THERMOPOMPE GÉOTHERMIQUE À EAU GEOCOOL A ÉTÉ CONÇUE POUR NÉCESSITER LE MOINS DE MAINTENANCE POSSIBLE. IL SUFFIT DE PEU DE MAINTENANCE POUR QUE VOTRE SYSTÈME FONCTIONNE AUSSI EFFICACEMENT QUE POSSIBLE. IL EST FORTEMENT RECOMMANDÉ DE FAIRE VÉRIFIER L'UNITÉ UNE FOIS PAR AN PAR UN PROFESSIONNEL QUALIFIÉ. DE NOMBREUX INSTALLATEURS PROPOSENT DES CONTRÔLES DE MAINTENANCE PRÉVENTIVE.
• La plomberie d'ECS consiste en une boucle de recirculation fermée qui est purgée de l'air par l'installateur. Si une maintenance ou un remplacement du réservoir d'ECS est effectué, s'assurer que la plomberie de l'ECS est correctement purgée d'air. Consulter votre installateur / revendeur afin de connaitre les procédures appropriées avant de vider le réservoir d'eau chaude.
15.0 Dépannage de base pour l'unité Geocool En cas de problème avec vos unités, reportez-vous à la liste suivante pour les symptômes possibles et les mesures correctives. Présence d'eau autour de la base de l'unité : 1. Fuite d'eau. Trouver et réparer la fuite. 2. Absence de drainage du bac de condensation. Vérifier qu'il n'y ait pas d'obstruction, nettoyer le bac et le conduit du souffleur. 3.
5. Contacteur défectueux. Remplacer le contacteur. 6. Compresseur défectueux. Remplacer le compresseur. Vanne d'inversion ne commute pas 1. Le thermostat n'effectuant pas la demande de refroidissement. Vérifier le câblage et la programmation du thermostat. Réparer / remplacer si nécessaire. 2. Pas de tension au solénoïde. Corriger le problème de tension. 3. Bobine de solénoïde défectueuse. Remplacer le serpentin. La pression du fluide frigorigène trop élevée ou verrouillage à haute limite 1.
retirer la languette. VOIR LA SECTION 7.4 À LA PAGE 13 POUR DE PLUS AMPLES RENSEIGNEMENTS SUR LA PROTECTION CONTRE LE GEL. Le ventilateur fonctionne en continu lorsque le compresseur est éteint. 1. Thermostat réglé sur « fan on » (ventilateur en marche). Régler le thermostat sur « fan auto » (ventilateur automatique).
16.0 Schéma de câblage GeoCool Two-Stage Geothermal Heat Pump Wiring Diagram REV.