System information
- 7 -
3. UNPACKING, INSTALLATION AND SCALE INSPECTION 
3.1. Installation and operation place 
•  scale should be kept and use in free from vibration, shocks, drafts or dust rooms, 
•  the room’s air temperature range should be appriopriate to the instruction given on scale’s 
weight plate, temperature changes should be of laminar character, not higher than 0,5°C 
per hour, 
•  scale should be placed on console or stable desk free from vibration, far from heat 
emitters 
•  it is important to be particularly careful while magnetic product weighing as strong magnet 
is a part of scale; when magnetic products must be weighed, lifted loads weighing option 
should be used in order to  eliminate magnet’s  influence on  the product; lifting device is 
located in scale’s base. 
•  if  static  electricity  influences  scale’s  indications,  its  base  must  be  grounded.;  grounding 
bolt is placed on the back of scale’s base. 
3.2. Unpacking 
Carefully take out the device from packing, remove all plastic, cardboard and foil covers and 
transport protections. Then carefully put the scale on planned place of its use. As instructed in 
the outline attached to scale, put  pan and other parts in appropriate places. 
MGB microbalances 
A – pipettes calibration 
B – standard 
After scale installing at operating place, 
following should be set: 
1 – bottom ring 
2 – scale pan 
3 – weighing chamber glass shield 
5 – cover plate /for pipettes calibration/ 
After all elements setting, additional 
devices should be connected an d 
scale should be connected to power 
source. Supply socket is located on 
back of module casing equipped with 
display. 
For pipettes calibration: 
After scale starting, glass container (4) 
should be placed and after indication 
stabilization TARE button should be 
pressed. 










