Installation Sheet
AromaSteam
™
Steamhead and
Optional Acrylic Shield Installation
NOTE: Steamhead to be installed 6-12” above the floor. A 1.5” diameter hole in the steamroom is required to mount the steamhead. Refer to the
AromaSteam Steamhead Manual for additional installation information.
The Acrylic Shield (PN 103938SQ ) is to be used when acrylic or other non-heat resistant materials are used for the steamroom enclosure.
AromaSteam INSTALLATION
21
Step 1
Attach Locating Nipple to
steam line.
Step 2
Provide a 1 ½” hole in
finished wall to mount
the steamhead.
Step 3
Remove Locating Nipple
and attach steam head.
Oil Well
69992_PUR_100431_MrSteam.indd 22 2013-11-15 07:38










