Controls Installation Sheet
mr
.
steam
®
  Installation & Operating Instructions
______________________________________________________________
11
5. 
Route the end of the probe cable with the 
temperature probe through the wall into the 
steam room as shown in Diagram 2.
IMPORTANT NOTE: 
Do not strain, 
staple, pinch or otherwise damage the probe 
cable.
6. With a minimal length of the cable exposed 
apply silicone (provided) to the hole in the 
wall as required to create a moisture seal as 
shown in Diagram 2.
7. Push the temperature cable and probe into 
hole as required to leave minimum 1/4”, 
maximum 1/2” of the bulb exposed as 
shown in Diagram 3. 
  Insure a minimum of 1/4” of 
the temperature probe is exposed to the air. 
Failure to do so may interfere with the ability 
to sense temperature and may result in 
excessive steam room temperatures.
  The exposed area of the tem-
perature probe must be free of silicone or any 
materials or obstructions that prevent direct 
exposure to the steam room air. Failure to 
do so may interfere with the ability to sense 
temperature and may result in excessive steam 
room temperatures
.
NOTE: For Illustrative Purposes Only. 
 Drawings Not to Scale
WARNING
!
WARNING
!
Silicone Sealant
Cable
Wall
1
⁄4" minimum
1
⁄2" 
maximum
DIAGRAM 2
DIAGRAM 3
Sectional View
Installed Remote 
Temperature Probe
showing a minimum 
of 1/4” of the probe 
exposed to steam 
room air 
s t e a m   r o o m   i n t e r i o r










