SECTION 2 VTG-IOM-2012-1001 INSTALLATION
2-13
8. Attach a ¼” water supply to the compression tting
on the oat. The water line must be connected to an
uninterruptible supply. Fulton recommends connecting
it before the “fast ll” valve to the boiler supply but
after the back ow preventer to avoid contamination
of a potable water supply. Maximum allowable water
pressure to the compression tting is 100 PSI.
Install pH Neutralization Kit
The pH Neutralization Kit is a Fulton-provided kit designed to
bring the pH level of the boiler’s condensate to a neutral level.
It is not a replacement or alternative for the Condensate Drain
Trap. See Figure 6.
Adhere to the following for installation:
1. Use stainless or galvanized pipe and ttings to connect
condensate drain to kit.
2. Connect kit downstream of Condensate Drain Trap. See
Figure 7.
3. Pipe outlet to appropriate drain.
NOTE: ´ Replacement bags are available from the Fulton Parts
Department. The medium in the container will neutralize the
condensate of 12 MM Btu’s for approximately 6 months.
TABLE 3 NOMINAL PIPE SIZE
Nominal
Pipe Size
ID Equivalent Pipe
Length
Max Capacity in ft3 of natural gas per hour. Pressure drop of
0.5”wc/Equivalent length of pipe (feet)
(“) (“) 90 Elb
(Feet)
Tee
(Feet)
20 40 60 80 100 150 200
1-1/4 1.380 3.45 6.9 950 ----- ----- ----- ----- ----- -----
1-1/2 1.610 4.02 8.04 1460 990 810 ----- ----- ----- -----
2 2.067 5.17 10.3 2750 1900 1520 1300 1150 950 800
2-1/2 2.469 6.16 12.3 4350 3000 2400 2050 1850 1500 1280
3 3.068 7.67 15.3 7700 5300 4300 3700 3250 2650 2280
4 4.026 10.1 20.2 15800 10900 8800 7500 6700 5500 4600
6 6.07 10.10 23.60 ----- ----- ----- ----- 20200 16503 12766
8 7.98 13.30 29.10 ----- ----- ----- ----- 41200 33660 29128
FIGURE 6 FULTON PH NEUTRALIZING KIT WITHOUT PUMP