User manual

Test Report ------------------------------------------------------------------------------- 37/48
Report No.: M47ET060805 (ETSI EN 301 489)
Training Research Co., Ltd., TEL: 886-2-26935155, Fax: 886-2-26934440
Chapter 9 Voltage DIP / Interruption Test
DIP Test information:
Test setup: According to EN 61000-4-11
Voltage dips: 30%, 0.01 Second
60%, 0.1 Second
Voltage interruptions: > 95%, 5 Seconds
Test mode: Ref. Test method of Chapter 1
Test instruments:
Name Model Number Serial Number Selected
Best Plus BURST ESD
SURGE TRANSIENTS
Best Plus V6.2 199749-019SC
BEST EMC Test
Instrument
BEST EMC V2.3
(-8, -9)
199918-006SC
Partner EMS Tester
Transienter-1000 PIO X
Comment:
Performance Criteria: (According to ETSI EN 301 489-1)
Dips 30%: ( X ) CT ( ) TT ( X ) CR ( ) TR
Dips 60%: ( ) CT ( ) TT ( ) CR ( ) TR
Interruptions >95%: ( ) CT ( ) TT ( ) CR ( ) TR
No unintentional responses shall occur at the end of the test;
( )Event of loss of function(s) ( )Event of loss of user stored data
Performance Criteria: (According to ETSI EN 301 489-17)
Dips 60%, 100 ms : ( ) A ( ) B ( X ) C
Interruptions >95%, 5 000 ms: ( ) A ( ) B ( X ) C