User manual
AP User Manual January 2004
Software Release 4.1
8.7.2 Capacity Criteria for the Link
A Canopy system link is acceptable only if the efficiencies that the link test confirms are greater
than 90% in both the uplink and downlink direction. When a new link is installed, a link test should
be executed to ensure that the efficiencies are within this recommended guideline.
8.7.3 High-priority Bandwidth Planning
High-priority bandwidth planning information for uplink and downlink allocation is provided under
High-Priority Bandwidth on Page 22.
8.8 TIME & DATE PAGE
An example of the Time & Date web page is displayed in Figure 34.
Figure 34: Time & Data screen
The Time & Date web page allows the operator to set the time and date for the AP. The operator
must set the time and date whenever both
• the AP is not connected to a CMM.
• a power cycle of the AP has occurred.
Issue 5 Page 91 of 102