8.7.2 Capacity Criteria for the Link
A Canopy system link is acceptable only if the efficiencies that the link test confirms are greater
than 90% in both the uplink and downlink direction. When a new link is installed, a link test should
be executed to ensure that the efficiencies are within this recommended guideline.
8.7.3 High-priority Bandwidth Planning
High-priority bandwidth planning information for uplink and downlink allocation is provided under
High-Priority Bandwidth on Page 22.
8.8 TIME & DATE PAGE
An example of the Time & Date web page is displayed in Figure 34.
Figure 34: Time & Data screen
The Time & Date web page allows the operator to set the time and date for the AP. The operator
must set the time and date whenever both
the AP is not connected to a CMM.
a power cycle of the AP has occurred.