User manual

AP User Manual
January 2004
Software Release 4.1
115/230 V switch
AC power
connectors
Fuse receptacle
Figure 25: Location of 115-/230-volt switch
NOTE: The AC power connectors are labeled N for Neutral, L for Line, and PE for
Protective Earth
or ground. The maximum thickness of wire to be used is 4 mm
2
or
12 AWG.
For a single AP that is not collocated with a CMM, connect the module to a power supply.
RESULT: When power is applied to a Canopy module or the unit is reset on the web-
based interface, the module requires approximately 25 seconds to boot. During this
interval, self-tests and other diagnostics are being performed. See Diagnostic LEDs on
Page 62.
For an AP cluster, connect the GPS sync port cable of at least one AP to the CMM.
7.5 VERIFYING SYSTEM PERFORMANCE
To verify the performance of the Canopy system after the APs have been installed, perform the
following steps:
Procedure 15: Verifying system performance
1. Access the web-based interface for each AP by opening
http://<ip-address>, where the <ip-address> is the address of the individual module.
2. In the menu on the left-hand side of the web page, click on GPS Status.
3. Verify that the AP is seeing and tracking satellites. (To generate the timing pulse, the
module must track at least 4 satellites.)
4. Take an SM into the area surrounding the newly installed AP cluster.
5. At a clear line of sight in each sector, verify that the SM registers to each installed AP.
NOTE: The SM must have the same color code as the AP for successful
registration.
Issue 5 Page 72 of 102