Specifications

2-20 800 MHz System Planner R4-11-4G
EQUIPMENT LIST, PROPOSAL, AND STATEMENT OF WORK
Creating the Statement of Work
2.8.4 Creating the Statement of Work
The SOW is a compilation of the system description, responsibilities, an ATP,
and other considerations as earlier discussed in this chapter. After
completion of the equipment list, the SOW needs to be created. This
document provides the customer with a clear description of the
responsibilities and actions of the Motorola team. The SOW details those
items provided by others, such as application software for the host or mobile
computers.
The SOW should minimally contain the following:
Radio frequency (RF) coverage maps using the mobile data parameters
of the areas covered as they relate to the customer’s operational area
ATP to validate the RF coverage
Acquisition and development plans for base station sites, if required
A list of throughput assumptions based on business case analysis
A frequency plan
An equipment list (both fixed network equipment and subscriber units)
System drawings
Recommendations for client’s future needs