User guide
March 2005 Managing Your Canopy Network
Through Software Release 6.1
Page 350 of 425 Issue 1
Canopy System User Guide
Capacity Criteria for the Link
A Canopy system link is acceptable only if the efficiencies of the link test are greater than
90% in both the uplink and downlink direction. Whenever you install a new link, execute a
link test to ensure that the efficiencies are within recommended guidelines.
26.6.6 Reg Failed SMs Page (AP, BHM)
An example of the Reg Failed SMs screen is displayed in Figure 129.
Figure 129: Reg Failed SMs screen
The Reg Failed SMs web page identifies SMs (or BHSs) that have recently attempted
and failed to register to this AP (or BHM).
26.6.7 Spectrum Analyzer Page (SM, BHS)
See Monitoring the RF Environment on Page 285.