Technical information

Power On/Off Operation
16 G24-L Module Hardware Description November 15, 2008
Figure 2-6 illustrates the power-off timings when using the IGN signal.
Figure 2-6: IGN Power Off Timing
Turning the G24-L Off Using AT+MRST
The AT+MRST command initiates a G24-L system reset operation, which powers off the G24-L.
This command emulates the ON_N signal operation for power off.
Power Loss shut down
A low power shut down occurs when G24-L senses the external power supply is below the
minimal operating limit. The module will respond by powering down automatically without
notice.
This form of power-down is not recommended for regular use since the unexpected power loss
may result in loss of data.