User guide
Canopy System User Guide
Installing an AP
pmp-0229 (Mar 2013)
391
Figure 129: Ground lug and coaxial cable of OFDM AP
19. Connect the Ethernet cable from the AP to the other RJ-45 port of the 600SS.
20. Wrap an AWG 10 (or 6mm
2
) copper wire around the Ground post of the 600SS.
21. Tighten the Ground post locking nut in the 600SS onto the copper wire.
22. Securely connect the copper wire to the grounding system (Protective Earth) according to
applicable regulations.
23. Replace the cover of the 600SS surge suppressor.
24. Replace the bottom cover of the AP.
25. Adjust the initial down tilt of the AP/antenna assembly to 5°, −3 dB beam elevation, with
near-in null fill.
NOTE: The down tilt bracket is shown in Figure 130.