User guide
Canopy System User Guide Configuring a Point-to-Point Link for Test
pmp-0229 (Mar 2013)
233
Concluding the Test of Point-to-Point Links
To conclude the test, perform the following steps.
Procedure 16: Verifying and recording information from the BHM
1. Confirm that the GPS Sync Pulse Status field indicates Generating Sync.
NOTE: This indication confirms that the BHM is properly functional.
2. While your browser is set to this BHM Status page, note (or print) the values of
the following fields:
◦ Device type
◦ Software Version
◦ Board Type
◦ FPGA Version
3. Systematically ensure that you can retrieve this data when you prepare to deploy
the BHM.