User guide

Canopy System User Guide Configuring a Point-to-Point Link for Test
pmp-0229 (Mar 2013)
221
14. Click the Save Changes button.
15. Click the Reboot button.
RESULT: The BHM responds with the message Reboot Has Been Initiated….
This BH is now forced to provide sync for the link and has a distinct set of web
interface pages, tabs, and parameters for the role of BHM.
16. Wait until the indicator LEDs are not red.
17. Trigger your browser to refresh the page until the BHM redisplays the General
Status tab of its Home page.
18. Repeat these steps to configure the other BH in the pair to be a BHS, selecting
Timing Slave in Step 13.
Time Tab of the BHM
To proceed with the test setup, in the BHM, click the Configuration button on the left side of the
General Status tab. The BHM responds by opening its Configuration page to the General tab.
Click the Time tab. An example of this tab is displayed in Figure 72.
Figure 72: Time tab of BHM, example