Procedure:
1 Insert unterminated data cable through the cable gland cap.
2 Insert unterminated data cable through the cable gland body.
3 Terminate the RJ-45 connector onto the cable and plug into the desired repeater connector.
4 Screw the cable gland body into the repeater opening. Torque to 55 in/lb.
5 Screw the cap to the cable gland. Torque to 55 in/lb.
6 If a cable gland is not used, seal the opening with a M20 threaded plug. Torque to 55 in/lb.
10.4
Post Installation Checklist
After the repeater has been mechanically installed and all electrical connections have been made,
power may now be applied and the repeater checked for proper operation.
10.4.1
Apply Power
Turn ON the circuit breaker controlling the AC
source to the power converter that is supplying power to
the repeater.
10.4.2
Verify Proper Operation
Operation of the repeater can be verified by:
Observing the state of the three LEDs located on the front panel, and
Exercising radio operation.
CAUTION: Some repeater components can become extremely hot during operation. Turn OFF
all power to the repeater and wait until sufficiently cool before touching the repeater.
Symbol indicates areas of the product that pose potential burn hazards.
10.4.3
Front Panel LEDs
After turning on the repeater power (or after a repeater reset), the
three LEDs on the repeater front
panel:
Light for approximately one second to indicate that they are functional, then
Go off for one second, then
Indicate the operational status of the repeater.