Installation Manual

Table Of Contents
Chapter 10
SLR 1000 Installation
Related Links
Pre-Installation Considerations on page
93
SLR 1000 Repeater Package Contents on page 100
Mounting the SLR 1000 Repeater to a Wall or Ceiling on page 100
Mounting the SLR 1000 Repeater to a Pole on page 103
Electrical Connections on page 108
General Bonding and Grounding Requirements on page 114
General Cabling Requirements on page 115
Post Installation Checklist on page 115
10.1
Pre-Installation Considerations
Proper installation ensures the best possible performance and reliability of the repeater.
Pre-installation planning is required and includes considering the mounting location of the equipment in
relation to input power, antennas, and system interfaces. Also to be considered are site environment
conditions, the particular mounting method (several available), and required tools and equipment.
It is highly recommended to read the following before installing this type of equipment for the first time:
this entire installation section before beginning the actual installation, and
the Motorola Solutions Quality Standard Fixed Network Equipment Installation manual, R56 (which
can be obtained by ordering CDROM 9880384V83), specifically refer to the information on ground
connection for lightning protection.
Return to Process
SLR 1000 Installation on page 93
Related Links
Installation Overview on page 93
Site Environmental Conditions on page 94
Equipment Mounting Methods on page 95
Equipment Ventilation on page 95
AC and DC Input Power Requirements on page 96
Site Grounding and Lightning Protection on page 97
Recommended Tools and Equipment on page 99
Equipment Unpacking and Inspection on page 99
10.1.1
Installation Overview
The following information is an overview for installing the repeater and the ancillary equipment.
Step-by-step procedures for each of the major installation tasks are then provided beginning in
Mechanical Installation.
MN003557A01-AF
SLR 1000 Installation
93