Installation Manual

Table Of Contents
Chapter 10
SLR 1000 Installation
Related Links
Pre-Installation Considerations on page
94
SLR 1000 Repeater Package Contents on page 101
Mounting the SLR 1000 Repeater to a Wall or Ceiling on page 101
Mounting the SLR 1000 Repeater to a Pole on page 104
Electrical Connections on page 109
General Bonding and Grounding Requirements on page 115
General Cabling Requirements on page 116
Post Installation Checklist on page 116
10.1
Pre-Installation Considerations
Proper installation ensures the best possible performance and reliability of the repeater.
Pre-installation planning is required and includes considering the mounting location of the equipment in
relation to input power, antennas, and system interfaces. Also to be considered are site environment
conditions, the particular mounting method (several available), and required tools and equipment.
It is highly recommended to read the following before installing this type of equipment for the first time:
this entire installation section before beginning the actual installation, and
the Motorola Solutions Quality Standard Fixed Network Equipment Installation manual, R56 (which
can be obtained by ordering CDROM 9880384V83), specifically refer to the information on ground
connection for lightning protection.
Return to Process
SLR 1000 Installation on page 94
Related Links
Installation Overview on page 94
Site Environmental Conditions on page 95
Equipment Mounting Methods on page 96
Equipment Ventilation on page 96
AC and DC Input Power Requirements on page 97
Site Grounding and Lightning Protection on page 98
Recommended Tools and Equipment on page 100
Equipment Unpacking and Inspection on page 100
10.1.1
Installation Overview
The following information is an overview for installing the repeater and the ancillary equipment.
Step-by-step procedures for each of the major installation tasks are then provided beginning in
Mechanical Installation.
MN003557A01-AF
Chapter 10: SLR 1000 Installation
94