User's Manual

1-22
PMP320HDW2v1
Preliminary
JUL
2010
PMP
320
Hardware
Installation
Site
preparation
Table
1-2
CAP
320
Antenna
Specifications
CAP
320
Antenna
Specifications
Antenna
Beam
W
idth
16.5
dBi
gain
Dual
P
olarity
+/-
45
4
sector
application
(actual
3
dB
antenna
pattern:
60
degree
horizontal
Table
1-3
CAP
320
Physical
Specifications
CAP
320
Physical
Specifications
P
ower
Consumption
<
25
W
atts
T
emperature
-40°
F
to
+131°
F
(-40°
C
to
+55°
C)
W
ind
Survival
118
miles/hr
(190
km/hr)
Dimensions
(LxWxD)
Integrated:
~711
x
195
x
240mm
Connectorized:
~330
x
195
x
140mm
W
eight
Integrated:
5.5
kg
Connectorized:
2.2
kg
F
or
additional
information
regarding
spectrum
and
frequency
information,
refer
to
the
PMP
320
Administration
and
Configuration
Guide
located
at:
http://motorola.wirelessbroadbandsup-
.
port.com/support/library/
Site
preparation
Review
the
following
site
requirements
before
selecting
the
site
for
the
installation
of
the
PMP
320
CAP
:
V
erify
that
a
good
Earth
Ground
can
be
achieved
at
the
site.
V
erify
that
the
power
to
the
site
is
reliable
and
can
be
backed
up
by
an
uninterruptible
power
supply
(UPS).
V
erify
that
access
to
the
site
is
easy
if
an
urgent
need
arises.
(It
can
take
up
to
forty
-
five
minutes
to
key
-
down
the
transmitters
at
certain
locations.)
V
erify
that
the
site
is
secure.
Be
sure
to
negotiate
a
contract
with
the
site
owner
that
allows
easy
swap
-
out
of
existing
equipment
without
an
added
cost.
Accurately
measure
the
latitude
and
longitude
of
the
location
for
future
reference.