User's Manual

Table Of Contents
2.3 INSTALLINGTHEAP
so
nownasthe
w.motorolawls.com/Dynamic/Course_Description.asp?number=ANT001
heseproceduresarespecifictothecaseofasAPpurchasedasakitconsistingofa
connectorizedantennaandaconnectorizedradio.
AshortcoaxialcablefromtheradioterminatesinamaleNconnector.Theantennahas
achassismountedfemaleNconnector.Theantennaincludestowermountbrackets
withadjustabledowntilt.
InstallinganAPtypicallyconsistsoffourphases:
.ConfiguretheAPatanoperator'sfacilityorattheinstallationsiteusingthe
formationandsettingsdefinedinthePlanningandConfiguringsectionsofthisuser
nna,andbrackets)andphysicallyinstallitusing
Procedure2.ACMM4istypicallyinstalledatthesametime,ifnotpreviously
installed.
3.CabletheAPtotheCMM4andgroundittoProtectiveEarthPEusing
Procedure
4
.Thisphasecanalsoincludecablingtobackhauls,orrunningterrestrialfeeds.
5.Confirmoperation,usingSMsinthefield.
Localpracticesandchoicesofinstallationoptionswilldictatetheactualprocesses.For
example,
variationsonthesegeneralizedprocedurescanbeusedtoinstallonabuildingorinstall
multiple
APsonapipemountbeforehoistingupatowerforfinalattachment.
Generalcommunicationsequipment,infrastructure,andfacilitiessitedesignshouldbe
performed
inlinewithMotorola’s“StandardsandGuidelinesforCommunicationsSites”(al
k
R56manual)availablefrom
http://ww
CD&CourseKe
y=125
T
1
in
guide.
2.AssembletheAP(radio,ante
15