User's Manual
Table Of Contents
- COMPUTER SOFTWARE COPYRIGHTS
- Introduction
- What is the X-Pad Terminal
- Unpacking
- X-Pad Parts
- Charging the Battery
- Figure 3. Battery Installation and Removal
- Battery Installation and Removal
- 1. Insert the battery, bottom end first, into the battery compartment (see Figure 3).
- 2. Carefully press the battery top downward until it clicks into place. When X-Pad is powered by ...
- 1. Turn the X-Pad off by holding the Power button pressed (see Figure 1), for at least four seconds.
- 2. Press the Release Buttons on the battery sides (see Figure 3) and pull away the battery from t...
- The Universal Office Dock (UOD) Unit
- First Time Battery Charge
- Routine Battery Charge
- Battery Maintenance
- Battery Storage
- Extending Battery Life
- Using the X-Pad
- Maintaining the X-Pad
- Accessories
- Troubleshooting
- Safety Instructions
- SPECIFICATIONS
7
The Universal Office Dock (UOD) Unit
The UOD unit is used for charging the X-Pad battery and communicating
with the X-Pad through an IrDA port. Each UOD unit has nine slots. Each
slot may accommodate either a X-Pad with a battery attached, or a battery
(stand-alone). Each of the nine slots has a status LED with an associated
number. The LEDs are laid out in the same order as the slots. When a slot
is empty, its corresponding LED is Off. When a battery or a X-Pad with a
battery is inserted to a slot, the slot LED turns On, indicating the battery
charge (see Table 1). The battery power can also be tested by pressing the
battery power TEST button (see Figure 5).
Universal Office Dock
(UOD) Unit
UOD status LED
Battery Charge
X-Pad charged
with battery
installed
Slot LEDs
Figure 4. Universal Office Dock (UOD) Unit