Users Manual Part 2

Alarm ID
Descrip-
tion
Recovery
Action
Clear Ac-
tion
Notes
ALM_TX_KEYED_FWD_PW
R_HIGH
The output
power rose
above
140% of the
current tar-
get (pro-
grammed)
power (the
power level
that is ex-
pected to
be currently
set).
The power
leveling pro-
cedure is
executed to
get the out-
put power to
the expected
level.
When the
output power
is restored to
the expected
level the
alarm is
cleared
The alarm may
be reported be-
cause of the
BRC hardware
failure or config-
uration prob-
lems.
ALM_BRC_ETH_LAN1_LINK
_ALM
Ethernet
LAN1 Link
is down -
the link
state
change is
reported by
CPLD by
the interrupt
(Host
IRQ2).
No recovery
action taken
by the soft-
ware.
When the
link is up
then the
alarm is
cleared.
The link to Site
Controller is dis-
connected or
failed.
ALM_BRC_ETH_LAN2_LINK
_ALM
Ethernet
LAN2 Link
is down -
the link
state
change is
reported by
CPLD by
the interrupt
(Host
IRQ2).
No recovery
action taken
by the soft-
ware.
When the
link is up
then the
alarm is
cleared.
The link to Site
Controller is dis-
connected or
failed.
ALM_BRC_ETH_LAN_LINK_
FAIL
Reported
when
ALM_BRC_
ETH_LAN1
_LINK_ALM
is set and
ALM_BRC_
ETH_LAN2
_LINK_ALM
is set
No recovery
action taken
by the soft-
ware.
When the
link is up
then the
alarm is
cleared.
Both links to Site
Controller are
disconnected or
failed.
ALM_BRC_CP2A_LINK_FAIL
_ALM
CP2A Link
failure - the
link state
change is
reported by
CPLD will
automatical-
ly switch to
CP2B.
When the
link is up
then the
alarm is
cleared.
The link to Site
Controller is dis-
connected or
failed.
6802800U74-AP
Chapter 13: MTS Troubleshooting
416