Service Manual

251
6802800U74-AN
Chapter 6: Configuration and Testing
Step example:
RX1 delta : -100-(-96) = -4
RX2 delta: -100-(-97) = -3
RX3 delta: -100-(-96) = -4
13 Set the RSSI calibration values using the results from step 12 using the following command:
fcp -orxch1 -pcal_br<receiver number> -v<calculated calibration value>
Step example:
fcp -orxch1 -pcal_br1 -v-4
fcp -orxch1 -pcal_br2 -v-3
fcp -orxch1 -pcal_br3 -v-4
NOTICE: RSSI calibration is not operational before the BR is reset.
14 Repeat step 2 and then step 5 through step 13 for all branches until the RSSI level is correctly
calibrated for all branches.
15 Reset the BR. Use the following commands:
sge -orx_all -soff
reset -ocontrol
16 Verify RSSI for receive path 1, 2, and 3. Type ppr -orxch1 -a10 -r1
The following example shows a correctly calibrated RSSI level for all 3 receive paths.
Step example:
Receiver Number
=
1
2
3
SGC Attenuation
=
26214
26214
26214
Sync Location
=
276
264
258
Sync. Amplitude
=
131070
131070
131070
Total Bits
=
2592
2592
2592
Bits in Error
=
0
0
0
BER (%)
=
0.0000000000
0.0000000000
0.0000000000
RSSI (dBm)
=
-100
-100
-101
Postrequisites: BR-Arch-2 only: Verify and tune the receivers for the high power setting. See
Verifying and Tuning the Receiver RSSI Levels in a High Power Setting for BR-Arch-2 on page 251.
6.5.4.3.4
Verifying and Tuning the Receiver RSSI Levels in a High Power Setting for BR-
Arch-2
Receivers in BR-Arch-2 can work with two different power levels and require additional actions to fully
configure their RSSI levels. Perform this procedure only in BR-Arch-2 architecture.
Prerequisites:
Ensure that the RSSI levels for low power setting are properly configured. See Verifying and Tuning
the Receiver RSSI Levels on page 249.
Set up the equipment for receiver verification and tuning. See Setting Up the Equipment for
Receiver Verification on page 248.
Contact your local Motorola Solutions representative or Technical Support to obtain required
password.