User's Manual

Table Of Contents
Important: Connect the ribbon cables at the rear before sliding the unit into the chassis.
12 Secure the Site Controller in the chassis with the captive screws.
13 Except the power cables, reconnect all other cabling to the unit as tagged during the removal.
14 Power up the Site Controller:
a Reconnect the power cables to the MTS Power Supply Units.
b Set the power switch to the ON position.
15 Perform Resetting the RTC Battery Status on page 275.
278
| Site Controller
Send Feedback | September 2014 | 6802800U74-AD
Applicant: Motorola Solutions
Equipment Type: ABZ89FC5827 / 109AB-5827
Exhibit D2