User's Manual
Table Of Contents
Simulcast Hardware Installation Installing the STR 3000 Base Radio Rack
Figure 5-3 Layout of the Base Radio Modules
Installing the STR 3000 Base Radio Rack
The STR 3000 Base Radio Rack is shipped in a cabinet. To install this STR 3000 cabinet, prepare
the site and bolt the rack to the floor in the location indicated on the site design drawings.
Placement of the Rack
Always use two or more persons and appropriate lifting equipment
whenever moving an STR 3000 rack. A fully configured rack weighs
approximately 360 kg (800 lbs). Death, serious personal injury, or
equipment damage can result if the rack tips over.
General suggestions for placing the rack are as follows:
• Secure the rack on a firm and level floor. Use the correct mounting hardware
to eliminate component movement.
• Use strain relief when installing and positioning cables and cords to ensure
that no interruption of service occurs.
• Locate the STR 3000 cabinet where it can be serviced easily. Service people
require access to the front and the rear of the system.
• Locate the STR 3000 cabinet in an area that is free of dust, smoke, and debris.
• Maintain proper grounding and electrostatic discharge (ESD) precautions.
68P81003Y71-O November 2002 5-7