Instruction Manual

Table Of Contents
Review installation information specifically for GTR 8000 Base Radios and subsystems in GTR 8000
Base Radio Hardware Installation
on page 94.
3.3.1
General Site Preparation Overview
Perform the activities listed in this table to ensure proper site preparation. The table references specific
chapters in the Motorola Solutions Standards and Guidelines for Communication Sites manual for
more information.
Table 32: Activities for Site Preparation
Activity Description of Activity Chapter Reference
Review the site plan.
Prevents potential on-site and
off-site interference by local
trunked systems.
Minimizes cable lengths.
Determines the location of tele-
com equipment.
Chapter 2 "Site Design and De-
velopment"
Determine site access
and security.
Outlines of site access and securi-
ty measures.
Chapter 2 "Site Design and De-
velopment"
Review safety consid-
erations.
Outlines general, installation, and
environmental safety guidelines
and requirements and OSHA-relat-
ed considerations.
Chapter 3 "Communications
Site Building Design and Instal-
lation"
Schedule installation
of telephone service.
Ensures options and functions of
on-site, two-way communications
for personnel safety and mainte-
nance.
Chapter 3 "Communications
Site Building Design and Instal-
lation"
Review grounding
specifications.
Ensures that the site meets or ex-
ceeds the Quality Audit Checklist
in Appendix F as well as the Power
and Grounding Checklist in Appen-
dix D.
Appendix D. “Grounding (Earth-
ing) Electrode System Testing/
Verification”
Appendix F. “R56 Compliance
Checklist”
Schedule installation
of site power.
Covers grounding, power sources,
and surge protection.
Chapter 4 "External Grounding
(Earthing)"
Chapter 5 "Internal Grounding
(Earthing)"
Chapter 6 "Power Sources"
Chapter 7 "Surge Protective
Devices"
MN003286A01-H
Chapter
3: GTR 8000 Base Radio Installation
87