TriStar MPPT 600V Installation & Operation Manual

24
Installation
and below and at least 1” (25 mm) between the controller and adjacent walls for proper air
owasshowningure3-11below.
AT LEAST
1” (25 mm)
AT LEAST
6” (150 mm)
AT LEAST
6” (150 mm)
COOL AIR
WARM AIR
Figure3-11.Requiredmountingclearanceforairow.
3. Place a mark on the mounting surface at the top of the keyhole.
4. Remove the controller and drill a 3/32” (2.5 mm) hole at the drill mark.
5. Insert a #10 screw (included) into the top pilot hole. Do not tighten the screw completely.
Leave a 1/4” (6 mm) gap between the mounting surface and screw head.
6. Carefully align the keyhole on the TriStar MPPT 600V with the screw head. Slide the
TriStar MPPT 600V down over the keyhole.
7. Check for vertical plumb with a level.
8. Mark two (2), or four (4) if installing DB model, mounting hole locations in the wiring box.
9. Remove the controller and drill 3/32” (2.5 mm) holes at the drill marks.
10. Carefully align the keyhole on the TriStar MPPT 600V with the screw head. Slide the
TriStar MPPT 600V down over the keyhole.
11. The pre-drilled pilot holes should align with the mounting holes in the wiring box. Secure the
controller with two (2) or four (4), for DB model, #10 mounting screws.
12. Tighten the keyhole screw.